AMPCO PROJECT ACCOMPLISHMENT

Year 2023 Project Finish / Ongoing

  • U-610 Sea water Chlorination (V-ditch)

  • Turn Around (TAR 2023)

  • Supply Labour 2012 – Present

Year 2021 Project Finish

  • Diesel Tank Foundation

  • Gexcon New Support Services and E&I Workshop

Year 2018 Project Finish

  • Gexcon Storeman and vehicle supply

  • Gexcon Civil Work Support RMU1 HV Cable Exposure

  • Gexcon External Cleaning Works and Civil Work

  • Gexcon Project Phase 2 (Control Room)

  • Gexcon Project (New Admin Building) Carpark

  • Gexcon Project Phase 2 (New Control Room) Building Foundation

  • Potable Water Chlorinator Site Cleanup & Reinstatement

  • Drainage Works within the Plant RO Building Extension

  • House Upgrade Works

  • Cacahual Village (Adjacent to House A 10)

  • Maintenance Sandblasting and Painting of Crude Methanol Tanks TK-802A/B

  • DSC Foundation Pad and Relocation of Porta Cabin

  • Design and Installation of Concrete Foundation for New E-510 A & B

Year 2017 Project Finish

  • Erection of Gexcon building

  • Installation of underground services to the Gexcon building

  • Installation of French drains and V- ditches for Gexcon building

  • Construction of footpaths around Gexcon building

  • De – commissioning of existing RO building

  • Erection of new RO building

  • CSR Batete School Admin Building

  • RO Upgrade Project New Building

  • Potable Water Chlorinator Foundation

  • Various Drainage Works within the Plant

  • Access Platform Projects-Erection Work

Year 2016 Project Finish

  • Supply of Vehicles for TAR

  • Supply of Scaffold Erectors for Painting Project

  • TAR Support

  • Installation of Location Monuments

  • Drainage Works in North Fire Water Tank Ditches

  • Entrance Staff Parking Lenel Barrier Installation

  • Excavating Inspection Pits for New Gexcon Building

  • Construction of New Laydown Stone Area for Gexcon Building

  • Cutting and Removal of Large Trees in Gexcon Area

  • Drainage Works and Re Landscaping for Methanol Tank Bund Area

  • Supplying Labour to Excavate to Locate Existing Services for Gexcon Project

  • Surveying Works Throughout Plant and Facility

  • Installation of Concrete Pad for New RO Tank

  • Supply of Scaffolding Team

  • Supply of Insulating Team

  • To supply plant, Equipment and Manpower for Gexcon Earthworks

  • To construct New Lift Station

  • Construction of Three Number Concrete Bunded Area Slabs for Desal Dosing Area

  • Construction of Concrete Bunded Diesel Transfer Slab

  • Construction of New Foundations and Slab for Gexcon Building Section F

  • Construction of Temporary Footpath to Tank 802 A

  • Construct Concrete Slab Entrance to Duel Fuel Area

  • Plant Drainage and Re Landscaping in Duel Fuel Area

  • Construction of New Foundations and Slab for Gexcon Building Section E

  • Installation of Ducts and Foul Services for Gexcon Building and Temp Offices

Year 2022 Project Finish

  • U-610 Sea Water Chlorination Building Civil works

  • Supply Labour 2012 – Present

Year 2019 Project Finish

  • Installation of Concrete Foundation

  • New Office Foundation Warehouse

  • Gexcon Phase 3 Changing room Facility and Drainage work

  • Gexcon Phase 3 Concrete Blocks Installation

  • Sea Water Intake

  • Pedestrian Access Concrete Bridge

  • Gexcon Project Phase 3, Warehouse New Offices Foundation

  • Installation of Concrete Foundation for LV-402A Piping Modification

  • Construction of a Block Work “Rebound” Wall at the Rear of Tennis Court

  • Gexcon Project Staff Shower Changing Room Facilities Building-Erection of Building

  • New Changing Room (Underground HV Cable Route from RMU2 to RMU3)

  • Gexcon Project Phase 3, Laboratory and Document Control Building Foundations

  •  Relocation of AMPCO Tent

  • Gexcon Phase 3.1, Changing Room Concrete Walls Rendering, Bollard Foundations, Footpaths and Canopies Slabs

  • Ampco Building Lightning Protection Systems Installation

  • Installation of Foundations for plant access platforms (U-670, U-680, ISO Tank, Pre reformer, Potable water Chlorinator)

  • AMPCO Diesel Tank Foundation

  • AMPCO Relocation of Building 514, Dome

  • Gexcon Phase 3, Surface Water Underground Services

  • Gexcon Phase 3, National Change Room – GRP Floor Installation Site Support

  • New Warehouse Offices Project – Installation of Underground Services

  • Laboratory and Fire Line Extension

  • Plant Platform and Iso Tank

  • Gexcon Phase 3.1, Changing Room (Building Erection)

  • Gexcon Project Phase 3, Laboratory and Document Control Building (Building Erection)

  • GexCon-Phase 3.4- Extension to fabrication shop Building Foundation

Year 2015 Project Finish

  • Dome Works

  • Various Drainage Repair Works

  • New Asphalt Works

  • New Sewage Lift Station

  • Remodel Building 508

  • TAR Support

Year 2014 Project Finish

  • Asphalt AMPCO Camp Level 1 & 2  

  • Perimeter Drainage  

  • Desalination Bases  

  • Drainage Works  

Year 2013 Project Finish

  • Asphalt Garage & Fabrication Yard

  • Asphalt Cacahaul Heights Level 2

  • Nitrogen PSA System Piping 2013

  • Demolition of Old AMPCO Camp Level 1 & 2 2013

Year 2012 Project Finish

  • School Crossing Various Sites in Malabo