AMPCO PROJECT ACCOMPLISHMENT
Year 2023 Project Finish / Ongoing
- U-610 Sea water Chlorination (V-ditch) 
- Turn Around (TAR 2023) 
- Supply Labour 2012 – Present 
Year 2021 Project Finish
- Diesel Tank Foundation 
- Gexcon New Support Services and E&I Workshop 
Year 2018 Project Finish
- Gexcon Storeman and vehicle supply 
- Gexcon Civil Work Support RMU1 HV Cable Exposure 
- Gexcon External Cleaning Works and Civil Work 
- Gexcon Project Phase 2 (Control Room) 
- Gexcon Project (New Admin Building) Carpark 
- Gexcon Project Phase 2 (New Control Room) Building Foundation 
- Potable Water Chlorinator Site Cleanup & Reinstatement 
- Drainage Works within the Plant RO Building Extension 
- House Upgrade Works 
- Cacahual Village (Adjacent to House A 10) 
- Maintenance Sandblasting and Painting of Crude Methanol Tanks TK-802A/B 
- DSC Foundation Pad and Relocation of Porta Cabin 
- Design and Installation of Concrete Foundation for New E-510 A & B 
Year 2017 Project Finish
- Erection of Gexcon building 
- Installation of underground services to the Gexcon building 
- Installation of French drains and V- ditches for Gexcon building 
- Construction of footpaths around Gexcon building 
- De – commissioning of existing RO building 
- Erection of new RO building 
- CSR Batete School Admin Building 
- RO Upgrade Project New Building 
- Potable Water Chlorinator Foundation 
- Various Drainage Works within the Plant 
- Access Platform Projects-Erection Work 
Year 2016 Project Finish
- Supply of Vehicles for TAR 
- Supply of Scaffold Erectors for Painting Project 
- TAR Support 
- Installation of Location Monuments 
- Drainage Works in North Fire Water Tank Ditches 
- Entrance Staff Parking Lenel Barrier Installation 
- Excavating Inspection Pits for New Gexcon Building 
- Construction of New Laydown Stone Area for Gexcon Building 
- Cutting and Removal of Large Trees in Gexcon Area 
- Drainage Works and Re Landscaping for Methanol Tank Bund Area 
- Supplying Labour to Excavate to Locate Existing Services for Gexcon Project 
- Surveying Works Throughout Plant and Facility 
- Installation of Concrete Pad for New RO Tank 
- Supply of Scaffolding Team 
- Supply of Insulating Team 
- To supply plant, Equipment and Manpower for Gexcon Earthworks 
- To construct New Lift Station 
- Construction of Three Number Concrete Bunded Area Slabs for Desal Dosing Area 
- Construction of Concrete Bunded Diesel Transfer Slab 
- Construction of New Foundations and Slab for Gexcon Building Section F 
- Construction of Temporary Footpath to Tank 802 A 
- Construct Concrete Slab Entrance to Duel Fuel Area 
- Plant Drainage and Re Landscaping in Duel Fuel Area 
- Construction of New Foundations and Slab for Gexcon Building Section E 
- Installation of Ducts and Foul Services for Gexcon Building and Temp Offices 
Year 2022 Project Finish
- U-610 Sea Water Chlorination Building Civil works 
- Supply Labour 2012 – Present 
Year 2019 Project Finish
- Installation of Concrete Foundation 
- New Office Foundation Warehouse 
- Gexcon Phase 3 Changing room Facility and Drainage work 
- Gexcon Phase 3 Concrete Blocks Installation 
- Sea Water Intake 
- Pedestrian Access Concrete Bridge 
- Gexcon Project Phase 3, Warehouse New Offices Foundation 
- Installation of Concrete Foundation for LV-402A Piping Modification 
- Construction of a Block Work “Rebound” Wall at the Rear of Tennis Court 
- Gexcon Project Staff Shower Changing Room Facilities Building-Erection of Building 
- New Changing Room (Underground HV Cable Route from RMU2 to RMU3) 
- Gexcon Project Phase 3, Laboratory and Document Control Building Foundations 
- Relocation of AMPCO Tent 
- Gexcon Phase 3.1, Changing Room Concrete Walls Rendering, Bollard Foundations, Footpaths and Canopies Slabs 
- Ampco Building Lightning Protection Systems Installation 
- Installation of Foundations for plant access platforms (U-670, U-680, ISO Tank, Pre reformer, Potable water Chlorinator) 
- AMPCO Diesel Tank Foundation 
- AMPCO Relocation of Building 514, Dome 
- Gexcon Phase 3, Surface Water Underground Services 
- Gexcon Phase 3, National Change Room – GRP Floor Installation Site Support 
- New Warehouse Offices Project – Installation of Underground Services 
- Laboratory and Fire Line Extension 
- Plant Platform and Iso Tank 
- Gexcon Phase 3.1, Changing Room (Building Erection) 
- Gexcon Project Phase 3, Laboratory and Document Control Building (Building Erection) 
- GexCon-Phase 3.4- Extension to fabrication shop Building Foundation 
Year 2015 Project Finish
- Dome Works 
- Various Drainage Repair Works 
- New Asphalt Works 
- New Sewage Lift Station 
- Remodel Building 508 
- TAR Support 
Year 2014 Project Finish
- Asphalt AMPCO Camp Level 1 & 2 
- Perimeter Drainage 
- Desalination Bases 
- Drainage Works 
Year 2013 Project Finish
- Asphalt Garage & Fabrication Yard 
- Asphalt Cacahaul Heights Level 2 
- Nitrogen PSA System Piping 2013 
- Demolition of Old AMPCO Camp Level 1 & 2 2013 
Year 2012 Project Finish
- School Crossing Various Sites in Malabo 

