"Forging progress through disciplined management, technical expertise, and a relentless focus on quality."
2025
Project Completion
Works Carried Out for MEGPL
Installation of Load Breaker Switch (LBS) for five Transformers
Installation of Load Breaker Switch (LBS) for five Transformer
Installation of Cable Tray Support
Produced Water Header Piping Fabrication and Installation (Alba B1 & B2)
Phase III Potable Water Geotechnical Testing
Ground Flare Road and Stormwater Management Major Upgrade
Central Canteen Camera Installation
Gas Plant Phase 2A Moles Sieves Change Out Campaign
Installation of Lighting at Diesel Transfer Pump Pre-Construction and Construction activities
CCR Roof Water Proofing
Works carried out for Chevron
Installation of Drop Object Protection (Alen offshore)
MDOS Tower Roof repair services (Main Office Building Rooftop Waterproofing)
Placement of Muster Horn on Operations