"Driving structural integrity and project efficiency from the ground floor to the final closeout."

2019


Project Completion

Works Carried Out for MEGPL

Installation of Electrical Panel

Replacement of Glass Roof Canopy in Main Office

Turbo Gas Control Room – Painting, Roof Water Proofing and Door Repairs

Backfill Land Survey and Road Access

Backfill Gas Drilling and Soil Services

Geotechnical Drilling Temporary Road Construction

Slug catcher site upgrade

Works Carried Out for Noble Energy / CHEVRON

Concrete Plinths

Noble Luba Exhaust Fan and Electrical Sockets Installation

Steel Plate and Threaded Bar Fabrication and installation

Steel Cover

Platform Modification with Post Support

Works Carried Out for MAERSK

Heli Fuel and Tank Cleaning

Supply of Scaffolders

Works Carried Out for U.S. Embassy

Painting of Office Building and Fence

Block Paving for sidewalk

Works Carried Out for Schlumberger

40 Foot Office Container Fully Furnish

Works Carried Out for FMC Technip

V-Ditch Stoning

Warehouse and Office Building (Roof and Cladding Replacement)

Offices and Workshop Replacement Roofing

Works Carried Out for AMPCO

Installation of Concrete Foundation

New Office Foundation Warehouse

Gexcon Phase 3 Changing room Facility and Drainage work

Gexcon Phase 3 Concrete Blocks Installation

Sea Water Intake

Pedestrian Access Concrete Bridge

Gexcon Project Phase 3, Warehouse New Offices Foundation

Installation of Concrete Foundation for LV-402A Piping Modification

Construction of a Block Work “Rebound” Wall at the Rear of Tennis Court # 6

Gexcon Project Staff Shower Changing Room Facilities Building-Erection of Building

New Changing Room (Underground HV Cable Route from RMU2 to RMU3)

Gexcon Project Phase 3, Laboratory and Document Control Building Foundations

Relocation of AMPCO Tent

Gexcon Phase 3.1, Changing Room Concrete Walls Rendering, Bollard Foundations, Footpaths and Canopies Slabs

Ampco Building Lightning Protection Systems Installation

Installation of Foundations for plant access platforms (U-670, U-680, ISO Tank, Pre reformer, Potable water Chlorinator)

AMPCO Diesel Tank Foundation

AMPCO Relocation of Building 514, Dome

Gexcon Phase 3, Surface Water Underground Services

Gexcon Phase 3, National Change Room – GRP Floor Installation Site Support

New Warehouse Offices Project – Installation of Underground Services

Laboratory and Fire Line Extension

Plant Platform and Iso Tank

Gexcon Phase 3.1, Changing Room (Building Erection)

Gexcon Project Phase 3, Laboratory and Document Control Building (Building Erection)

GexCon-Phase 3.4- Extension to fabrication shop Building Foundation

Works Carried Out for APR Energy

(2) TM2500 Turbines, 66Kv, 50Hz, Natural Gas, Power Plant, (Marathon Oil), Equatorial Guinea