2016
Project Completion
Works Carried Out for MEGPL
Old Maintenance Building Conversion
Galley HVAC Upgrade Works
Mess Hall Feeder Line Works
Installation of Waste Management Shelter
Installation of Transportation Office Canopy
Installation of Warehouse Preservation Area
Container Yard Fencing Project
Installation of Concrete Channel Drain at Level 0
Several Water Leek Repairs in The Facility
Asphalt Repairs
Installation of Concrete Pads for Arc Flash Mitigation T 103, T105
Excavation and Cable Installation at Substation Level 2
Installation of Fire Suppression
Galley HVAC New Drainage System
Galley HVAC Installation of Catchment Basin and 10” line
Removal of IT Building and Foundations
Works Carried Out for Noble Energy / CHEVRON
Construction & Refurbishment of Existing School at Basakato 2015/16
Design, Construction of Foundations and Erecting 6 Mobi Covers 2016
Construction of Foundations and Installation of Shutter Doors on Main Building 2016
Installation of Tie in to Main Sewer Line 2016
Supply Designated Team to carry out Methanol Transfers from Tanks to Boats
Installation of New Fence Around Coms at Pico 2016
Works Carried Out for AMPCO
Supply of Vehicles for TAR
Supply of Scaffold Erectors for Painting Project
TAR Support
Installation of Location Monuments
Drainage Works in North Fire Water Tank Ditches
Entrance Staff Parking Lenel Barrier Installation
Excavating Inspection Pits for New Gexcon Building
Construction of New Laydown Stone Area for Gexcon Building
Cutting and Removal of Large Trees in Gexcon Area
Drainage Works and Re Landscaping for Methanol Tank Bund Area
Supplying Labour to Excavate to Locate Existing Services for Gexcon Project
Surveying Works Throughout Plant and Facility
Installation of Concrete Pad for New RO Tank
Supply of Scaffolding Team
Supply of Insulating Team
To supply plant, Equipment and Manpower for Gexcon Earthworks
To construct New Lift Station
Construction of Three Number Concrete Bunded Area Slabs for Desal Dosing Area
Construction of Concrete Bunded Diesel Transfer Slab
Construction of New Foundations and Slab for Gexcon Building Section F
Construction of Temporary Footpath to Tank 802 A
Construct Concrete Slab Entrance to Duel Fuel Area
Plant Drainage and Re Landscaping in Duel Fuel Area
Construction of New Foundations and Slab for Gexcon Building Section E
Installation of Ducts and Foul Services for Gexcon Building and Temp Offices
Works Carried Out for Ministry of Mines and Hydrocarbons (MMH)
MMH Bome Camp consist of General Maintenance of the Complex & Gardening Services 2016 – Present
Works Carried Out for Hess
Fabrication of Racks in Bome
Supply Security Services in Bome
Removal and Re Installation of Rigging Loft
Construction of Lifting Frames for Welding Machines
Supply of manpower to Erect Racking
Works Carried Out for Bohlen Doyen
Construction of New CNG Bus Station Carpark & V Ditches in Malabo 2016
Construction of New CNG Bus Station Carpark in Bata 2016